- Equipment

Tower Crane

Power 380V, 30m high, 35m arm long, remote control.
Year of manufacture 2002.


Crane self rising

220V and 380V power, 12 m height, arm length 14 meters, remote control, mounting in 15 minutes.
Year of manufacture 1987.


Hydraulic Scaffolding

Power 380V, 20m high, 8m long platform.
Year of manufacture 1985.
more equipment >>
- Company services
- Civil constructions
- About EURO Construction

Euro Construction Company was founded in 2005 on the initiative of the three partners of the firm - Cojocaru Constantin, Cojocaru Ionut and Bassetto Simone. It all started in Italy, when they met on a construction site in Vicenza and after just a few hours of discussion they decided to join forces, to form a team to capitalize on their experience from the years spent working there.

They all agreed that this project will get noticed by being serious and having a concept that will make it stand apart from other companies present in the construction filed of Galati.

As a first step they decided to build a complex of 11 apartments, work on which they applied some ideas taken over from Italy such as planning an underground parking for all apartments, a barbeque area reserved for residents, execution of common parts to premium standards and interior finishes according to customers’ choice.

Another idea that they were very keen to implement was that of documenting each stage of construction and to make all information available to those interested in purchasing an apartment.

This was appreciated by customers, as documents and photos provided more certainty and weighted in favor of the acquisition of apartments.

find more >>
- Contact Us

- e-mail:
contact@euro-constructii.ro
office@euro-constructii.ro

- mobile:
+4 0724 150 277, +4 0726 143 184

- company headquarters:
Frunzei Street 77, bl. Flora, ap. 4
Galaţi, Romania

send a message >>
Soon:

Residence "LAGUNA"

District of villas near Lake Brateş - "Residence LAGUNA" !

Project in progress:

Doja II Building

     A block consists of ground-floor, basement and 5 floors. It contains 19 apartments from 1 room to 4 rooms and 2 commercial spaces.

The block was designed and developed by customer requirements that have not been able to buy the block Doja I.

Date of finalization according to contracts 31.12.2012.
- Photo Gallery -     - Viewing 3D Doja II Building -                     - sus -
Completed project:

Doja I Building

- sold out

     The building is located on the Gh. Doja street 73-75 and was designed by architects Salaru Mihai and Salaru Lucia from S.C. Arhigrafic S.R.L.

Landmarks of construction:
- it is located near High school No 10 “Sfanta Maria”;
- located between the Siderurgistilor street and George Cosbuc boulevard.
The building is structured as follows:
- garages in the basement;
- ground floor is reserved for retail space;
- the 5 floors and the attic have a total of 32 apartments.
     The building land belongs to the trading company Euro Construction Ltd. The construction was begun on January 12, 2009 and on December 31, 2009 the building already had the structure, external walls and roof completed and 30% of the interior partitions!
The apartments have 2 rooms (with areas of 44 sqm, 67 sqm, 89 sqm), 3 bedrooms (93 sqm and 97 sqm) and 4 rooms (with an area of 112 sq m).
We offered to the customers who contracted apartments since the resistance structure phase (frame structure without walls) the opportunity to customize their future home and a divide it according to their preferences.
Each apartment is finished according to customer preferences (tiles, floors, doors, sanitary ware), has its own central heating and air conditioning. The building will be equipped with a specially designed area for barbeque and a playground for children.
Finishes of the common parts were made of natural stone with aluminum elements (railings) and movement sensors were mounted for lighting, last generation elevator and video intercom.
Flexibility regarding payment method, prices comparable to those of apartments over 20 years old and rapid completion date (August 31, 2010) are assets that strengthen our belief that we have the best product on the real estate market from Galati. This guarantee will be backed by the gallery of pictures taken at all stages of construction, from the first day until the date on which you have keys in hand!
Contributors to this project: RODLAGERO, DEDEMAN, STILOTERM, ARABESQUE, CONSTAM , FIGRAN, ROMALUMIL , MIRCO ITALIA.
- Photo Gallery -     - Viewing 3D Doja Building -                     - up -
Completed project:

Flora Building

- sold out

Our first project was completed in August 2006 - December 2008 along with architect Aritoneta Negoita.
Designed for customers who want more than just an apartment, the building was a great success, being sold in full since the phase of structure of resistance!
Landmarks of construction:
- Access to underground garages - Frunzei Street 77;
- Pedestrian access - by Gh. Asachi Street
      The building is located close to public transportation stations and near the Children's Hospital, the kindergarten, school and high school, market and other important objectives. As outdoor planning it is provided with green spaces and a special area for barbeque, reserved exclusively for owners of apartments and in the interior, from entrance one can see the aesthetic finishes made with granite and stainless steel railings.
The apartments with generous surfaces are heated with central heating, have Italian-style shutters on windows and balcony access doors and the final design elements are chosen by customers. Everything to satisfy the customer desires and to reinforce the belief that he chose the best possible real estate investment.
The building is divided into the following five levels:
- basement garage;
- the ground floor includes office space and three apartments;
- each of the three floors has seven apartments.
Privacy is ensured through:
- remote for access to underground garages;
- video intercom with color monitor at the courtyard entry;
- video intercom with color monitor at the staircase entrance.
Companies that have worked with us to accomplish this building are: RODLAGERO, STILOTERM, FORFAIT, VITEX, CERAMEXPERT, ROMSTAL, MIRATEX, ELECTRA SYSTEMS, MARMOGRANIT, FIGRAN, ORON, ARABESQUE, DEDEMAN, MIRCO ITALIA.